The Engineering Inspector will hold the developer responsible for drainage issues during the construction of subdivisions and for two years after the subdivision has been accepted into City’s maintenance. The City is responsible for the infrastructure and major drainage features after the two-year warranty period, but not drainage on individual lots unless a major drainage feature is no longer functioning properly.